Adijyoti Industries Logo
Home Products Contact Us
Custom Machinery & Solar
Govt. Approved Subsidy

High-Tech
Machinery & Solar

Establish your industrial unit with state-of-the-art machinery and sustainable solar power. Get combined benefits of Central & State schemes.

With Subsidy

Max Benefit: ₹10 Lakhs

Standard Plan

Direct Purchase

Machinery
Solar Setup
Save Up To ₹10L Subsidy
Comprehensive Infrastructure

Everything You Need
For a Grand Success

Scale from Micro to Mega Units

Machinery Detail

Custom Machinery

High-precision industrial equipment tailored for your specific production goals.

PLC Control
Auto Flow
Project Layout & Design

We provide complete 2D/3D industrial layout planning ensuring maximum space utilization and efficient workflow.

Hybrid Solar Integration

Integration of high-wattage monocrystalline panels with existing machinery to reduce operational electricity costs by up to 70%.

DPR & Subsidy Filing

End-to-end assistance in Detailed Project Report (DPR) preparation and online filing for Central and State subsidies up to ₹10 Lakhs.

Ready to Scale?

Consultation is 100% Free for new units

Get Free Consultation

Integrated
Industrial Ecosystem

Machinery + Solar + Subsidy

Project Machinery

  • 01

    Custom Fabrication

    Tailored design for Food, Agro & MSME manufacturing units.

  • 02

    Smart Automation

    PLC-based control systems for reduced labor & high output.

Power Solution

  • 03

    Solar Plant Setup

    High-efficiency On-Grid/Off-Grid systems for zero bills.

  • 04

    Load Management

    Syncing heavy machinery load with solar power generation.

₹10 LAKH Combined Govt. Subsidy
Apply Now
100% Compliance Checklist

Your Document Master Vault

Preparation is 90% of the success in government schemes.

Legal Entity

  • Registration Cert. MSME / Udyam / Company Incorporation
  • PAN Card Business PAN or Individual (Proprietor)
  • GST Certificate Mandatory for GST Input & Subsidy Claim

Site Records

  • Land Ownership 7/12 Extract / Khatauni / Jamabandi
  • Lease Deed Minimum 10-15 Years for Subsidized Projects
  • Plant Layout Site Map verified by Chartered Engineer

Bank Readiness

  • ITR Records Last 3 Years Audited Balance Sheets
  • Bank Statement Last 6-12 Months Current Account History
  • Sanction Letter Required for back-ended subsidy schemes

Technical File

  • Master DPR Detailed Project Report with ROI Analysis
  • Quotations Verified vendor quotes for machinery
  • NOC Certificates Pollution Control / Electricity Board NOC

Expert Advice: Aadhaar Seeding

Ensure your Aadhaar is linked to your Bank Account and Mobile Number for Direct Benefit Transfer (DBT).

Get Free Help